Now, we have 608 employees, including 40 management persons and 30 engineers. There are two assembling lines, one vehicle testing line, thus capacity of production can reach to 60 to 80 tricycles per shift.
We have two subsidiaries, one chassis factory and one carriage factory (including cab). There are separate welding lines for chassis, carriage and cab, and other two lines for pickling, phosphating and electrophoresis. There are more than 200 production equipment total. Production capacity will be 200 sets chassis and carriages, and 100 sets cabs per shift.
So far, Beiyi occupies an area of production workshop 80,000 square meters, office building and dormitory 5,840 square meters and green area 4,050 square meters. Five workshops are separately for final assembling, chassis, carriage